Welcome to Hajar Ehramat Company

  • Iraq, Basrah, Um-Qaser
  • Mobile : +964 7814000003 , +971503282110
  • info@hajarindustrial.com-infoh-ehramat.com

Projects Default

No. Project Client Year Location of project
1 Fit-Up, Welding, and Painting of Jetty Piling No. 39 Description: Successful execution of fit-up, welding, and painting of Jetty Piling No. 39 in Khor Al-Zubair, Basra, Iraq. This project involved precise technical work to ensure the safety and integrity of the jetty structure. Iraqi ports 2024 Khor Al-Zubair, Basra, Iraq
2 Fit-Up and Welding of 14-inch Line for Petroleum Derivatives Transfer from Khor Al-Zubair Port to Jetty No. 39 Description: Execution of fit-up and welding of a 14-inch line for the transfer of petroleum derivatives from Khor Al-Zubair Port to Jetty No. 39. This project was carried out to facilitate the safe and efficient transfer of petroleum derivatives between the port and the jetty. Iraqi ports 2024 From Khor Al-Zubair Port to Jetty No. 39, Basra, Iraq
3 Execution of 30,000 inches of Piping for Petroleum Derivatives Storage Tanks for Loading and Unloading between Shore and Sea Description: Successful execution of 30,000 inches of piping for petroleum derivatives storage tanks for loading and unloading between shore and sea. This project was designed to support storage and transfer operations of petroleum derivatives between shore and sea at Terminal No. 41FZE Iraqi ports 2024 Terminal No. 41FZE, between Khor Al-Zubair and Umm Qasr, Basra, Iraq
4 Construction underground swage at Albo Fiadt, Al-Asra Mafkoodin, and door Aluminum directorate of water and sewage in Thi Qar city 2023 Al Nasiriya Province
5 Construction of streets and underground swage network at Alshuhada and Alshabab road in Suk Alshuekh city directorate of water and sewage in Thi Qar city 2023 Al Nasiriya Province
6  VS Oil Terminal- Heat tracing Arabian Industries 2023 South KAZ-Basra Province
7 Provision of engineering, procurement, construction and commissioning (EPCC) for Gas Dehydration plant &dry Gas Pipeline PEG /PCIHBV 2022 Garraf Oil field
8 Al-Faisal – 76 km 20” pipeline PEG/Petronas 2022 Garraf refinery to AKTEYE
9 VS Oil Terminal –Piping Arabian Industries 2022 South KAZ-Basra Province
10 VS Oil Terminal –RFC1,2,3 Arabian Industries 2022 South KAZ-Basra Province
11  VS Oil Terminal –Package 20 Arabian Industries 2022 South KAZ-Basra Province
12  VS Oil Terminal –Package 40 Arabian Industries 2022 South KAZ-Basra Province
13 BGC (Basra Gas Company) tanks Arabian Industries 2022 BGC (Basra Gas Company)
14 installation and commissioning  of bypass system Almethali.co /Gasin cement Co 2022 Sulaymaniyah – Iraq 
No. Project Client Year Location of project
12 Extend and develop the entrance to the Suk Alshuekh City Directorate of road and bridges 2021 Al Nasiriya Province
13 Oil Port 11A – Piping & 5 tanks Al-Yamama 2021 South KAZ-Basra Province
14 Pozzolana cement production line(EPC-mechanical, ECI) Almethali.co /Tasluja cement Co. 2021 Sulaymaniyah – Iraq 
15 Train 3,4,5 Garraf Refinery- PEG Al-Faisal 2020 Garraf Refinery
16 SRC production line(EPC-mechanical ,ECI) Almethali.co /Tasluja cement Co. 2020 Sulaymaniyah – Iraq 
17 EPCC for Oil Trains 3,4, and 5 PEG /PCIHBV 2019 Garraf Oil Field
18 25 km pipeline and manifold- PS#2 Sana Al-Amar 2018 Grand Energy
19 Pozzolana cement production line(EPC-mechanical, ECI) Almethali.co /Holcim and Lafarge plan 2018 Karballa – Iraq 
20 Construct service road with BRC fence for pipeline Package between HAMADAN AND AL FAW Basra Oil Company 2015 Basra Province
21 Two ESP filters & ducting for Tasluja cement factory in Sulaymaniyah Tasluja cement 2014 Tasluja
No. Project Client Year Location of project
22 Samavah  Refinery (removing a demolished storage tank) Samavah  Refinery 2013 Samavah
23 Rehabilitation of one H.F.O storage tank in Tasluja cement factory in Sulaymaniyah Tasluja cement 2013  Tasluja
24 Construct underground sewage network in Suk Alshuekh city directorate of water and sewage in Thi Qar city 2012 Al Nasiriya Province
25 Construct streets and underground swages and for rains in Door Aldhibad district and others area in Suk Alshuekh directorate of water and sewage in Thi Qar city 2012 Al Nasiriya Province
26 Amarah Depot (rehabilitation of 10 storage tanks) Amarah Depot 2012 Amarah
27 Samavah  Refinery (14 fixed & flouting roof storage tanks) Samavah  Refinery 2012 Samavah
28 Basra Zubair2 Depot (2×58000 m3 single deck flouting roof storage tanks) Basra Zubair2 Depot 2011 Basra Zubair
29 Samavah  Refinery (removing a demolished storage tank) Samavah  Refinery 2013 Samavah
No. Project Client Year Location of project
30 Construction streets with infrastructure in Suk Alshuekh Directorate of road and bridges 2010 Al Nasiriya Province
31 Al Diwaniyah  Refinery (17 fixed and flouting roof storage tanks) Al Diwaniyah  Refinery 2009 Al Diwaniyah
32 Sulaymaniyah  Airport (3 jet fuel fixed roof storage tanks) Sulaymaniyah  Airport 2008 Sulaymaniyah
33 Bazian refinery (7 double roofs with double deck flouting roof storage tanks) Bazian refinery 2007 Bazian

 

h-ehramat.com